Expo Condos – Highway 7 and Creditstone Road Vaughan

From Contact Us For Pricing
Property type: New Projects

EXPO CONDOS
HIGHWAY 7 AND CREDITSTONE ROAD
REGISTER NOW

Register Below & Receive Floor Plans & Price List

Buy With Us To Get VIP Club Incentives


REAL ESTATE INFORMATION

Expo Condos 3 is a new condominium development currently in pre-construction at York Regional Road 7 and Creditstone Road in Vaughan, Ontario by the Cortel Group. It is a proposed 39 storey tower in EXPO City’s master-planned development and is “Vaughan’s most anticipated community”.

Expo City by the Cortel Group is designed as a “sustainable, pedestrian friendly urban centre, featuring luxury residences, a retail avenue, and over 14 acres of naturalized space on the Black Creek, including a sprawling central park filled with recreational trails, ponds, and protected wildlife areas”. The first phase Expo Condos is now complete and the second phase Expo Condos 2 is currently under construction. The third phase Expo Condos 3 is coming soon located just north of Tower 1.

The driving force behind the change coming to Vaughan is the extension of the TTC subway line up to Highway 7 which will add six new stops that will end at the Vaughan Metropolitan Centre and is the first time in history that the subway will extend outside of Toronto. This will give Vaughan residents easy access to downtown Toronto. The terminal station at the Vaughan Metropolitan Centre will be located at Millway Avenue and Highway 7 and will connect with the York Region Transit Bus Terminal and the VIVA Rapid Transit bus routewhich will run along Highway 7.

Expo Condos 3 by the Cortel Group is where you can live, work and play. Located to accessible public transportation and situated in new “urban village that has everything you need: luxury condos, great shopping, restaurants and cafes, office towers, acres of green space, bike paths, recreation and more”.

The Vaughan Metropolitan Centre

The Vaughan Metropolitan Centre was at the heart of Vaughan’s growth strategy since as early as 1997. The first residential building was completed in 2014 with Expo City and the new KPMG office tower was the first commercial building completed just this summer.

It is expected that the community will attract a young innovative and skilled workforce and this will be reflected in the community of residence as well.

This will be further facilitated by the areas 8.6km stretch of 6 new TTC subway stations including a new regional transportation hub, and connections to Toronto and York University and connect to the Greater Toronto Area through access to VIVA routes.

This new subway station at Highway 7 and Millway Avenue is expected to be at the geographic centre of down-town VMC, just minutes from cosmos Condominiums.

The area is expected to be home to over 25,000 people, residing in 12,000 residential units, and employ up to 11,500 people including as many as 5,000 new office jobs.

 

Deposit Structure:

Regular Deposit International Deposit
$5,000 on Signing $5,000 on Signing
Balance to 5% in 30 Days Balance to 10% in 30 Days
5% in 120 Days 10% in 120 Days
5% in 360 Days 10% in 360 Days
5% in 720 Days 5% in 720 Days
1% on Interim Occupancy 1% on Interim Occupancy

 

Special Client Incentive Program:

  • Free Assignment ($5,000 Value)
  • $5,000 Discount on Parking – $55,000 (Regular price of $60,000) *available for select models
  • $500 Discount on Locker – $5,000 (Regular price of $5,500)
  • Permission to Lease During Interim Occupancy
  • Development Charge Capping
    • $6,500 for 1 Bedroom & 1 Bedroom + Den
    • $7,500 for 2 Bedroom & 2 Bedroom + Den
    • $8,500 for 3 Bedroom & 3 Bedroom + Den
    • + Section 37 capped at $1,850
  • Special Top Performer Pricing ($49,000 savings)

REGISTER NOW AS A VIP CLIENT.
BY REGISTERING YOU WILL GET PRICES & FLOORPLANS.
YOU WILL ALSO BE INFORMED FOR ALL UPCOMING NEW PROJECTS.